Columbus, OH, USA
New Cancer Treatment Center
HOK designed this new $300M, 830,000 SF thirteen story facility, comprised of seven patient floors stacked and organized into two wings of a tower located above a four story diagnostic and treatment podium. Project includes expansion of existing emergency department in an adjacent building and incorporates a variety of sustainable design features in pursuit of LEED certification.
In addition to estimating services, Cost Benefit analysis of these features was part of the deliverable. MossCost participated in a Value Engineering workshop, which was successful in identifying necessary savings to bring the project into budget.
Ross, Doan, James, Cramblett Buildings Code Updates
Provided schematic design estimates and life cycle cost analysis for approximately 100 MEP upgrades on the medical campus with a total cost of $120M.
Infrastructure
Provided schematic design estimates for $76M worth of roadway and infrastructure improvements for the new medical center expansion. Project includes a number of sustainable features and civic upgrades that required separate funding estimates. image source